arrow-left-lightarrow-left-thinarrow-right-lightarrow-right-thinarrow-rightbriefcaseclose-4closedownload-2download-3downloademail-2emailenvelopeexpand-buttonlinklocklogo-carronpadlock-2padlockpager-arrow-leftpager-arrow-rightsearchsharesocial-facebooksocial-instagramsocial-linkedinsocial-pinterestsocial-twittersocial-whatsappsocial-youtubetimes

CONSTRUCTION OF A BUILDING FOR JEWELLERY PRODUCTION AND RELATIVE OUTBUILDINGS AND INFRASTRUCTURE WORKS IN VALENZA (PROVINCE OF ALESSANDRIA)

ConstructionSede societaria

The works involved the construction of a new jewellery manufacturing facility with outbuilding for office use in the municipality of Valenza in the province of Alessandria. The production complex is one of the largest in Europe and can contain over 700 workers. The plot is part of a larger complex that provides for the redevelopment of the entire area with the construction of an exhibition area, a new road system and new standards. The contract also included the construction of a new access road via the existing roundabout and two public car parks with a total capacity of approximately 130 parking spaces. The new road system ends just beyond the entrances to the car parks at the entrance to the new production site. The road continues inside the private property where the employee car parks are located.

The project was drawn up according to the LEED 2009 Italia for New Construction and Major Renovations protocol and has reached the LEED Silver standard.

  • Contracting entityBvlgari Gioielli
  • Place Alesandria (AL) view map
  • Work start date08/07/2015
  • Work end date31/10/2016
  • Type of workSede societaria
  • DesignerOpen Project srl