arrow-left-lightarrow-left-thinarrow-right-lightarrow-right-thinarrow-rightbriefcaseclose-4closedownload-2download-3downloademail-2emailenvelopeexpand-buttonlinklocklogo-carronpadlock-2padlockpager-arrow-leftpager-arrow-rightsearchsharesocial-facebooksocial-instagramsocial-linkedinsocial-pinterestsocial-twittersocial-whatsappsocial-youtubetimes

NEW BUS STATION IN MONTECCHIO MAGGIORE AND LINKS TO THE REGULAR ROAD NETWORK – ROAD COMPLETION WORKS

InfrastructureOpere di completamento della nuova autostazione di Montecchio Maggiore e collegamenti con la viabilità ordinaria

The current A4 Motorway exit at Montecchio Maggiore is an important motorway junction connecting the primary road system to the regional and provincial mobility system, as well as to the Superstrada Pedemontana Veneta (SPV) motorway. In such a context, therefore, the road system of the present project makes it possible to create a new exit interconnecting he motorway system with the ordinary network, in a different position from the current one and, above all, compatible with the junction of the new Superstrada Pedemontana Veneta, to create a motorway-type interconnection between the A4 and the Superstrada Pedemontana
Veneta, to ease the traffic load conditions on the road and existing junctions, and to build a new maintenance centre, larger than the current one, at the current location of the Montecchio Maggiore exit.
It is an extremely complex project due to the significant interactions with the flow of motorway and railway traffic. In particular, it is planned that the motorway site, strongly affected by the construction of the new infrastructure, will be diverted to the south for a stretch of approximately 2,000 m, with a maximum transverse movement of the carriageways of approximately 30 m.
This section of the road will be completely resurfaced. The upgrading, reconstruction and new construction of the following road structures will also be carried out: G01 and G02 railway tunnels, Montecchio junction (with motorway flyover, underpass and slip roads) and junction buildings serving all the motorway activities already in operation at the current junction. Lastly, a series of minor hydraulic structures and works for the control and regulation of the existing hydraulic water network.

  • Contracting entityAutostrada Brescia Verona Vicenza Padova S.p.A.
  • Place Montecchio Maggiore VI view map
  • Work start date23/09/2019
  • Type of workOpere di completamento della nuova autostazione di Montecchio Maggiore e collegamenti con la viabilità ordinaria
  • DesignerTechnital S.p.A. - Ing. Adrea Renso