arrow-left-lightarrow-left-thinarrow-right-lightarrow-right-thinarrow-rightbriefcaseclose-4closedownload-2download-3downloademail-2emailenvelopeexpand-buttonlinklocklogo-carronpadlock-2padlockpager-arrow-leftpager-arrow-rightsearchsharesocial-facebooksocial-instagramsocial-linkedinsocial-pinterestsocial-twittersocial-whatsappsocial-youtubetimes

RESTRUCTURING AND REDEVELOPMENT OF THE BNL BUILDING IN ROME

Restoration and RestructuringDirezionale

Complete restructuring of a complex built in the early 1960s, with a focus on renewal and energy efficiency, to achieve Class A1 classification. Carron wad responsible for the overall coordination of the worksite, along with all construction works. The intensive activities, which began in August 2017, were concluded in September 2018. It was a very extensive construction site spread over 10 floors, with 2 being underground, one on the ground floor and 6 above ground. In all, there is a total surface area of about 40,000 square metres. As part of a 100% redevelopment effort, an impressive environmental remediation campaign has been carried out, which allowed “asbestos-free” certification to be issued for the building. The company Engineering Spa has leased the property owned by BNL Paribas Group. The site has been studied in great detail in terms of the design and programming of the works, in order to optimise the resources enacted and to reduce the time of execution.

  • Contracting entityBNL - Gruppo BNP Paribas
  • Place Roma (RM) view map
  • Work start date10/08/2017
  • Work end date29/11/2018
  • Type of workDirezionale
  • DesignerPROGER Engineering & Management