arrow-left-lightarrow-left-thinarrow-right-lightarrow-right-thinarrow-rightbriefcaseclose-4closedownload-2download-3downloademail-2emailenvelopeexpand-buttonlinklocklogo-carronpadlock-2padlockpager-arrow-leftpager-arrow-rightsearchsharesocial-facebooksocial-instagramsocial-linkedinsocial-pinterestsocial-twittersocial-whatsappsocial-youtubetimes

NEW YSL COMPLEX

Construction

The project will transform the existing building complex into the new Yves Saint Laurent production plant, with adjoining offices. The existing buildings will be completely redeveloped and there are plans to create public and private parking spaces, carry out landscaping works, and complete and adjust the section of public road.
The complex consists of 2 buildings covering a total area of 29,300 m2; building A is developed over 4 floors while building B has 3 levels. The ground floor will house rooms dedicated to leather cutting and material storage; the first floor is mainly dedicated to assembly and quality control operations; the second floor has offices (bldg A) and prototyping, modelling and finished product rooms (bldg B); finally, the third floor features spaces for training, a conference room, canteen, kitchen, other offices, meeting rooms and facility rooms. The external areas will also be redeveloped with the construction of a new private car park and forecourt (31,000 m2), a public car park (13,900 m2), and the redevelopment of the existing public road system. The works will be carried out according to the LEED protocol (Gold level).

  • Contracting entityCDP Immobiliare SGR S.p.A.
  • Place Scandicci (FI) view map
  • Work start date25/10/2021
  • DesignerAICOM Engineering