arrow-left-lightarrow-left-thinarrow-right-lightarrow-right-thinarrow-rightbriefcaseclose-4closedownload-2download-3downloademail-2emailenvelopeexpand-buttonlinklocklogo-carronpadlock-2padlockpager-arrow-leftpager-arrow-rightsearchsharesocial-facebooksocial-instagramsocial-linkedinsocial-pinterestsocial-twittersocial-whatsappsocial-youtubetimes

EXECUTIVE DESIGN AND CONSTRUCTION OF 1ST LOT TRENTO 3 PURIFICATION PLANT

InfrastructureIndustriale

The project involves the construction of a purification plant for sewage from the civil sewerage system serving the drainage basin that includes the municipalities of Aldeno, Besenello, Calliano, Cimone, Garniga, Trento and part of Villa Lagarina for a total capacity of 300,000 equivalent inhabitants (I + II lot).
Very briefly, the project includes the construction of screening and initial lifting stations, installing a purification plant, carrying out the main construction work (34,000 sq.m. surface area). It also includes building a new section of state road to replace the existing one because it interferes with the purification plant (1,000 ml plus junctions and connections) and the implementation of a sewer collector system that guarantees final discharge of treated wastewater into the Adige River.
The project, which is of utmost importance and interest for the entire Autonomous Province of Trento, represents a state-of-the-art construction intervention from both a structural and landscape point of view. The plant will be totally integrated into the surrounding environment by means of replanting native flora previously removed to conceal and cover the structure.
Cutting-edge technology, plant engineering and energy content make the Trento Tre purification plant unique in the civil purification sector.
  • Contracting entityProvincia Autonoma di Trento
  • Place Acquaviva (TN) view map
  • Work start date24/04/2018
  • Type of workInfrastrutture